Archive for the category

Time Series (ARIMA)

Forecasting with ARIMA models chosen on the data, read through their residuals and their intervals. How far ahead a forecast stays useful, and how to tell. How to read it, and where it misleads.

A step of the Planning Story.

Forecast horizon: how far ahead a time series forecast is useful

Every forecast has a horizon where it stops being useful. This chart is how you find yours.

It plots the width of the 95% interval as a share of the forecast itself, week by week.

Continue reading →

Filed under Time Series (ARIMA)  |  Permalink

Weekly demand forecasting with ARIMA: setting stock on the interval

Dutch and Flemish foodservice distributor of frozen bakery, 182 weeks of cases shipped, asked how much safety stock the Christmas quarter needs.

A composite case, built from the kind of file we see most weeks. A foodservice distributor of frozen bakery products in the Netherlands and Flanders, delivering to about 1,900 cafés, hotels and canteens. Around 10,800 cases go out in an average week, at a stock cost of about €38 a case.

Continue reading →

Filed under Time Series (ARIMA)  |  Planning Story  |  Permalink

Residual autocorrelation: when a time series model is finished

This is the chart that tells you whether a forecast is finished, and almost nobody looks at it.

It is the autocorrelation of the residuals: what the model failed to explain, checked for whether it still has a shape. Twenty lags, and a band that marks where random noise would sit.

Continue reading →

Filed under Time Series (ARIMA)  |  Permalink

Three-year forecast from 26 months of data: say the horizon out loud

Spanish direct-to-consumer pet-food subscription, 26 months of monthly orders, asked for a three-year monthly forecast for a funding round.

A composite case, built from the kind of file we see most weeks. A direct-to-consumer pet-food subscription in Spain, launched in August 2024. Twenty-six months later it ships about 18,400 orders a month, and it is preparing a funding round.

Continue reading →

Filed under Time Series (ARIMA)  |  Planning Story  |  Permalink

Time series forecasting: why the interval is the real forecast

Three years of weekly installs, and twelve weeks of forecast. The part most people ignore is the shaded area.

That band is the forecast. The line through the middle is only its most likely reading, and if you quote the line without the band you have turned a range into a promise.

Continue reading →

Filed under Time Series (ARIMA)  |  Permalink